Home About Us Business Scope Achievement Typical Project New Technology Data download Contact Us 中文版
Main technical introduction:
Deliver high temperature waste gas from cooler (annular cooler or belt cooler) of sinter machine into waste heat boiler to generate super heat steam, and this steam can be collected to pipeline or for power generation.
Waste heat recovery method:
①Closed type circulating waste heat recovery system
②Open type circulating waste heat recovery system
③Waste heat hot water preparation system
④Hot water circulating air technology (researched & developed by SDM)
Main technical index:
◇  System air leakage is less than 25%;
◇  Power generation capacity per ton ore is high temperature waste gas;
◇  Middle pressure steam output per ton ore is 85~95kg;
  Ex-supply low pressure steam output per ton ore is 20~25kg.
Address of Head: office1969# Shunhua Road, High-tech Development Zone, Jinan City, Shandong Province, P.R.China
Post Code: 250101 TEL:0531-89703962
copyright:Shandong Province Metallurgical Engineering Co., Ltd.